|
A view during construction looking
from East
Babel over Vienna towards Marshal. |
|
View from East Babel showing all of
Babel
Yard. |
|
Vienna with Carnegie in back. Note flats and real model
structures. |
|
East Babel Yard with Vienna in background. Note control
panel, boxes
for card cards and building flats in Vienna. See neat
ideas for more information on how the boxes and panels are made. |
|
Carol Gardens. Notice building flat used as a place holder
until
a proper structure can be erected. See neat
ideas
for more information on how the flats are made. |
|
Cut-away tunnel. Lights are tips of Christmas tree string.
See neat
ideas for more information on how the tunnel is made. |
|
Control tower for Babel Yard with F7 passing under. |
|
Operating South Babel Yard. |
|
Operating in Vienna. |
|
Truck crosses track in front of S-12. Flagon not shown.
See neat
ideas for more information on how the track is laid in the street. |
|
AEM7 (painted ARE
high visibility yellow) and GG-1 (painted in the older ARE
red) meet in cut. Panagraphs are down; how are the engines getting
power? |
|
Vienna on right. Carnegie in back.
Note Track
Warrants, control panel, building flats. See neat
ideas for more information on Warrants. |